Penrith 08

Werrington Downs, Cambridge Park

2PTH-08
Fixed-Line Service Area Module

Fibre
Copper
HFC
Wireless
Satellite

Details

Primary Rollout Status (2PTH-08)
Status Ready for Service (Copper Switched Off)
Ready For Service 05 Aug 2015 (accurate as at 05 Aug 2015)
Build Commenced Jun 2014
Preparation Commenced May 2014
More info »
Serving Area Module Details
Service Area Module 2PTH-08 BF GF
Footprint Type Fixed-Line
Designation metropolitan
Construction Region Sydney Metro 1
Service Area 2PTH (Penrith)
Point of Interconnect 2PTH (Penrith )
Connectivity Service Area CSA200000010233
(Penrith 2 CSA)

Rollouts in this module

Brownfields Rollout

Additional Rollouts

Providers

Ask a question